Skip to content
Grime Getterz

Before and after

Real Results. Zero Excuses.

Every photo on this page was taken on the job, before and after. No renders, no stock. New jobs get added as the crew documents them.

Written

Flat quotes before any equipment comes off the trailer.

3,500+ PSI

Commercial rotary surface cleaners for stripe-free concrete.

40+ Cities

Owner-operated crews across Central Valley, East Bay & Sacramento.

Flat Quotes

Clear pricing in writing before work begins. Never an hourly meter.

Case study

Documented On The Job

Diesel soot and tire rubber on a freight loading dock along the Tracy logistics corridor, photographed before and after.

Tracy freight loading bay diesel soot removal before and after
Before
After

Loading dock · Tracy / Stockton (San Joaquin County)

Photographed on the job

Freight Corridor Loading Bay & Masonry Decontamination

Surface: 120ft commercial retaining wall & heavy vehicle concrete loading ramp.

The Problem: Heavy truck volume off Interstate 5 and Highway 99 left thick carbon diesel soot, tire rubber transfer, and mineral stains baked into porous cinder block retaining walls and delivery ramps.

The Solution: Heavy-duty industrial degreaser worked in with hot-water washing, which is what breaks diesel soot and tire rubber off porous block. Wash water was dammed, contained and recovered on site rather than left to run into the storm drain.

Result: Original masonry brightness back, and the slip-hazard oil sheen gone from the ramp.

From our job photos

More Work We Photographed

Two more pairs straight from the job photos, captioned with only what the pictures show.

Concrete drainage channel and trench drain beside a retaining wall, before and after pressure washing
Before
After

Photographed on the job

Drainage Channel and Trench Drain

Surface: Concrete drainage channel between a chain-link fence and a retaining wall, with a slotted trench drain along the base of the wall.

Before: The slab is dark and wet with silt, leaves and loose debris, and the grime runs up to the edge of the trench grate.

After: The same channel from the same spot, washed down to clean, even concrete with the grate edge clear.

Concrete loading ramp and curb wall beside a block building, before and after pressure washing
Before
After

Photographed on the job

Loading Ramp and Curb Wall

Surface: Concrete ramp and curb wall with a steel handrail, beside a block building.

Before: The face of the curb wall is streaked dark where runoff has stained the concrete, with a band of grime along its base.

After: The ramp surface washed clean along the block wall toward the dumpster area. The two photos were taken from different angles.

Got a mess like this?

Fast scheduling. Photo-documented results. A written quote before any work starts.